6M50 compressor unit is Shen steam a not mature products, not after commissioning,Shen steam experts said, as a high speed, large capacity, high power and high precision dynamic load equipment, in the positioning, leveling, installation process,piping concentricity adjusting difficulty quite large. After our rational organization,effective control of key process, careful construction, the successful completion of theinstallation, operation for several years very well.


6M32-190/314-BX, 6M50-308/314 type compressor sets each one

Installation scope:

Settlement test one or two sets of two floor platform installation, foundation;

Two, two sets of main motor, auxiliary equipment;

Three, two sets of various gas duct, compressor, vent duct drainage, water circulationduct and cooling water pipe, and the circular pipe installation;

Four, two sets of compressor electric appliance, instrument control system installation and electrical appliance, instrument pipe;

Five, responsible for the system blowing, no load test, load test of 72 hours of continuous operation qualification;

Check the site six, responsible for the high pressure elbow production, all the valvepressure test, the leakage test of safety valve;

Seven, two compressor duct installation, maintenance and system of parking.

 